Marco Tagliaferri / moc / 035-ranger / |
During the built of Goliath I got stuck several times. To get my mind free again and have a little success I built some smaller Mecha. Delta was the first of them. It was followed by Ranger. Again I was missing an upper body. As the leg constuction wasnt that heavy I desided to go for an anti aircraft mecha. Within two days with about 6 houres of building time it was finished. Its a small one, but somehow I like it. 2005-12-21 |
Primary content in this document is © Marco Tagliaferri. All other text, images, or trademarks in this document are the intellectual property of their respective owners. |
|
©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR |